Projects, projects, projects
We are often asked what exactly we do and produce. Often there is no clear answer to this question – even when you look around in our production. We produce many constructions, which are hidden inside some finished product. However, we also manufacture some devices – various sewage and wastewater treatment systems that are mainly used on ships. These systems can also be used in construction, oil rigs, in the mountains and elsewhere, where natural resources are limited, and waste disposal takes place on site.
That is why our employees in the projects and assembly department are always busy. Every project is unique - depending on the destination country, the delivery time, the materials used or the quality requirements. Our task is to produce with the highest quality and deliver on time, regardless of the difficult situation in the world.
Here are some examples of such projects:
Tallink MyStar
On April 6, 2020, because of yearlong preparations at Rauma Marine Constructions shipyard in Finland, one of the Tallink Group's key projects started - the construction of the environmentally friendly high-speed vessel MyStar. It is a great honour for our company to produce a food waste collection system, four vacuum units (Onlinemax), two biological membrane reactors (MBR 45) and other smaller equipment for this ship. All devices have passed the factory acceptance test and are awaiting approval from the end customer. The equipment is then cleaned, packed, and shipped to Finland.
https://www.baltictimes.com/tallink_grupp_names_new_tallinn-helsinki_route_shuttle_vessel_mystar/
https://www.cruiseandferry.net/articles/construction-begins-on-tallink-grupps-mystar-1
Windstar Legend
Windstar Legend is the second ship in the Windstar family. The overhaul of the first ship Windstar Breeze is in the final stages and in the summer the repair of the second ship Windstar Legend was started. All components and assembly parts for two MBR70s, including smaller products, were ordered from us.
Viking River USA
The company Viking River USA ordered from us an MBR145 and two blower stations for the American market. Our customer was in a hurry with this project. We are delighted that we were able to meet customer expectations and produce the parts at an accelerated pace.
https://www.vikingrivercruises.co.uk/ships/mississippi/viking-mississippi.html
As mentioned above, these projects are just few in a long list. Thanks to good cooperation and partnership, the number of such projects is currently increasing. This requires constant commitment and great flexibility from our employees.
We owe many thanks to our customer and partner EVAC Group for their trust and cooperation and to our employees, who daily prove that we can do anything if we put our minds to it. They make us proud.
More about our customer: https://evac.com/company/